Update Setup & Configuration
@@ -29,3 +29,24 @@ A window will popup. Select 'Python Scripting' on the left tab and make sure the
|
|||||||
|
|
||||||
Power BI will run a python script that will connect to all PLC's and collect tracking data. This can take a minute or so. When finished, the report will update with the new data. Make sure to save the report to keep the latest date.
|
Power BI will run a python script that will connect to all PLC's and collect tracking data. This can take a minute or so. When finished, the report will update with the new data. Make sure to save the report to keep the latest date.
|
||||||
On top of the report the last update date and time will be set to current.
|
On top of the report the last update date and time will be set to current.
|
||||||
|
|
||||||
|
# 5. Add remove PLC's
|
||||||
|
1. Open Power BI report
|
||||||
|
2. Open power query
|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|
3. Open df Source
|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|
4. Edit python script
|
||||||
|
|
||||||
|

|
||||||
|
|
||||||
|
5. Change plcs variable according to project details
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
Reference in New Issue
Block a user