From 507257a6dc8b9a0d5fcd1d032d87f65d722c4266 Mon Sep 17 00:00:00 2001 From: delias Date: Sat, 18 Oct 2025 08:31:07 +0000 Subject: [PATCH] Update Setup & Configuration --- Setup-%26-Configuration.md | 11 ++++++++++- 1 file changed, 10 insertions(+), 1 deletion(-) diff --git a/Setup-%26-Configuration.md b/Setup-%26-Configuration.md index 86cb621..6d55f56 100644 --- a/Setup-%26-Configuration.md +++ b/Setup-%26-Configuration.md @@ -19,4 +19,13 @@ File - Options and settings - Options A window will popup. Select 'Python Scripting' on the left tab and make sure there is a Python Home directory selected so Power BI can run python scripts -![emtpy](https://giteakaput.duckdns.org/Docs/PBI_Reports/raw/branch/main/Assets/Wiki/PBI_Setup_02.png) \ No newline at end of file +![emtpy](https://giteakaput.duckdns.org/Docs/PBI_Reports/raw/branch/main/Assets/Wiki/PBI_Setup_02.png) + +# 4. Refresh data +1. Open Report with Power BI desktop +2. Connect PC to PLC network and make sure network settings are correct and you can connect to all PLC's +3. Press Refresh button +![](https://giteakaput.duckdns.org/Docs/PBI_Reports/raw/branch/main/Assets/Wiki/PBI_Refresh_01.png) + +Power BI will run a python script that will connect to all PLC's and collect tracking data. This can take a minute or so. When finished, the report will update with the new data. Make sure to save the report to keep the latest date. +On top of the report the last update date and time will be set to current. \ No newline at end of file